Nasirzadeh, Farnad, Khanzadi, Mostafa, Alipour, Majid. (1393). Determination of Concession Period in Build-Operate-Transfer Projects Using Fuzzy Logic. , 7(2), 437-456. doi: 10.22059/ijms.2014.36625
Farnad Nasirzadeh; Mostafa Khanzadi; Majid Alipour. "Determination of Concession Period in Build-Operate-Transfer Projects Using Fuzzy Logic". , 7, 2, 1393, 437-456. doi: 10.22059/ijms.2014.36625
Nasirzadeh, Farnad, Khanzadi, Mostafa, Alipour, Majid. (1393). 'Determination of Concession Period in Build-Operate-Transfer Projects Using Fuzzy Logic', , 7(2), pp. 437-456. doi: 10.22059/ijms.2014.36625
Nasirzadeh, Farnad, Khanzadi, Mostafa, Alipour, Majid. Determination of Concession Period in Build-Operate-Transfer Projects Using Fuzzy Logic. , 1393; 7(2): 437-456. doi: 10.22059/ijms.2014.36625


سامانه مدیریت نشریات علمی. قدرت گرفته از سیناوب