Falahati, Hossein, Bijari, Mehdi. (1396). Lot-Sizing and Scheduling on Parallel Machine due to Earliness and Tardiness Cost. , 51(3), 363-374. doi: 10.22059/jieng.2017.132300.1006
Hossein Falahati; Mehdi Bijari. "Lot-Sizing and Scheduling on Parallel Machine due to Earliness and Tardiness Cost". , 51, 3, 1396, 363-374. doi: 10.22059/jieng.2017.132300.1006
Falahati, Hossein, Bijari, Mehdi. (1396). 'Lot-Sizing and Scheduling on Parallel Machine due to Earliness and Tardiness Cost', , 51(3), pp. 363-374. doi: 10.22059/jieng.2017.132300.1006
Falahati, Hossein, Bijari, Mehdi. Lot-Sizing and Scheduling on Parallel Machine due to Earliness and Tardiness Cost. , 1396; 51(3): 363-374. doi: 10.22059/jieng.2017.132300.1006


سامانه مدیریت نشریات علمی. قدرت گرفته از سیناوب