Janatyan, Nassibeh, Alavi, Somaieh, Parvinian, Seyed Mahdi. (1404). A Risk and Reliability-Based Scheduling Method for Troubleshooting Regulators in Gas Pressure Stations: A Case Study of Isfahan Gas Company. , 17(4), 62-81. doi: 10.22059/imj.2025.387414.1008211
Nassibeh Janatyan; Somaieh Alavi; Seyed Mahdi Parvinian. "A Risk and Reliability-Based Scheduling Method for Troubleshooting Regulators in Gas Pressure Stations: A Case Study of Isfahan Gas Company". , 17, 4, 1404, 62-81. doi: 10.22059/imj.2025.387414.1008211
Janatyan, Nassibeh, Alavi, Somaieh, Parvinian, Seyed Mahdi. (1404). 'A Risk and Reliability-Based Scheduling Method for Troubleshooting Regulators in Gas Pressure Stations: A Case Study of Isfahan Gas Company', , 17(4), pp. 62-81. doi: 10.22059/imj.2025.387414.1008211
Janatyan, Nassibeh, Alavi, Somaieh, Parvinian, Seyed Mahdi. A Risk and Reliability-Based Scheduling Method for Troubleshooting Regulators in Gas Pressure Stations: A Case Study of Isfahan Gas Company. , 1404; 17(4): 62-81. doi: 10.22059/imj.2025.387414.1008211