تعداد نشریات | 161 |
تعداد شمارهها | 6,532 |
تعداد مقالات | 70,501 |
تعداد مشاهده مقاله | 124,103,045 |
تعداد دریافت فایل اصل مقاله | 97,209,386 |
Design Model Innovative Performance Evaluation of Suppliers and Contractors in Construction Supply Chain Management | ||
Advances in Industrial Engineering | ||
مقاله 6، دوره 49، شماره 2، دی 2015، صفحه 199-210 اصل مقاله (1.03 M) | ||
نوع مقاله: Research Paper | ||
شناسه دیجیتال (DOI): 10.22059/jieng.2015.57059 | ||
نویسندگان | ||
Yaser Rahimi؛ Jafar Razmi* ؛ Esmaeil Cheraghi؛ Siros Shojaie | ||
Industrial Engineering, University of Science and Technology, Tehran, Iran | ||
چکیده | ||
This paper aims to present a model for agile supply chain model in construction enterprises with performance evaluation of suppliers and contractors. Management and selection of suppliers and contractors plays an important role in process of constructions, because contractors are as corner stones of construction projects. Also, contractors are the main factor in converting resources to the final products. Traditionally, contractor selection in construction projects is on the basis of the lowest proposed price. However, there are various qualitative and quantitative criteria with different priorities associated in this regard. In this paper, a hybrid method of DEA/AHP/ FDEMATEL (Data Envelopment Analysis/ Analytical Hierarchy Process/ Fuzzy DEMATEL) is used. First, important and effective evaluation criterion are selected through FDEMATEL approach. Then, DEA/ AHP method is implemented in order to evaluate and to prioritize the selected indicators and to incorporate them in supply chain. Furthermore, agility is involved in the considered supply chain model. | ||
کلیدواژهها | ||
Agile supply chain؛ Construction projects؛ Supply Chain Management؛ Suppliers performance evaluation | ||
عنوان مقاله [English] | ||
طراحی مدل نوآورانة ارزیابی عملکرد تأمینکنندگان/ پیمانکاران در زنجیرة تأمین پروژههای ساختوساز | ||
نویسندگان [English] | ||
یاسر رحیمی؛ جعفر رزمی؛ اسماعیل چراغی؛ سیروس شجاعی | ||
کارشناس ارشد مهندسی صنایع دانشگاه تهران | ||
چکیده [English] | ||
مدیریت ارزیابی و انتخاب پیمانکاران و تأمینکنندگان، بخشی اساسی از فرایند ساختوساز است؛ زیرا پیمانکاران، از ارکان اساسی پروژههای ساختوساز و عامل اصلی تبدیل منابع به محصول نهایی بهشمار میآیند. انتخاب پیمانکار پروژههای ساختوساز، براساس پایینترین قیمت پیشنهادی صورت میگیرد، اما شاخصهای کمی و کیفی متعدد، با درجات متفاوت اهمیت، در انتخاب پیمانکار یا تأمینکننده مطرحاند. هدف از این مقاله، ارائۀ مدل چابک زنجیرۀ تأمین در شرکتهای عمرانی و ارزیابی عملکرد تأمینکنندگان و پیمانکاران است. در این مقاله از رویکرد ترکیبی DEA/AHP/FDEMATEL استفاده شده است. در مدل ارائهشده، ابتدا با رویکرد FDEMATEL تأثیرگذارترین و مهمترین شاخصهای مطلوب ارزیابی عملکرد تأمینکنندگان و پیمانکاران شرکت انتخاب میشوند. سپس بهروش ترکیبی DEA/AHP ارزیابی و رتبهبندی و در شبکة زنجیرة تأمین گنجانده میشوند. در این شبکه، مفهوم چابکی نیز درنظر گرفته شده است. همچنین در این پژوهش، برای نخستینبار در ایران مدل زنجیرۀ تأمین در شرکتهای عمرانی، بررسی و طراحی شدند. | ||
کلیدواژهها [English] | ||
ارزیابی عملکرد تأمینکنندگان, پروژههای ساختوساز, زنجیرۀ تأمین چابک, مدیریت زنجیرۀ تأمین | ||
مراجع | ||
1- Simchi-Levi, D., Kaminsky, P. and Simchi-Levi, E. (2007). “Designing and managing the supply chain: concepts, strategies and case studies.” 3 nd Ed., McGraw-Hill/Irwin.
2- Thomas, D.J. and Griffin, P.M. (1996). “Coordinated supply chain management.” European Journal of Operation Research, 94(1), PP. 1-15.
3- Stadtler, H. and Kilger, C. (2005). “Supply Chain Management and advanced planning: concepts, models, and software and case studies.” Springer Verlag.
4- Tabrizi, B.H. and Razmi, J. (2010). “A stochastic programming based approach for supply chain network design under uncertain processing costs.” The 11th Asia Pacific Industrial Engineering and Management Systems Conference.
5- Chopra, S. and Meindle, P. (2004). “Supply Chain Management: Strategy, Planning, and Operations.” (2nd Ed.)Upper Sadle River: Pearson.
6- Benton, W.C. and McHenry, L.F. (2010). “Construaction Purchasing & Supply Chain Management.” Mc Graw Hill, New York Chicago San Francisco.
7- Eskigun, E., Uzsoy, R., Preckel, P.V., Beaujon, G., Krishnan, S. and Tew, J.D. (2005). “Outbound Supply Chain Network Design with Mode Selection, Lead Times and Capacitated Vehicle Distribution Centers.” European Journal of Operational Research, Vol. 165, No. 1, PP. 182-206.
8- Razmi, J., Rafiei, R. and Hashemi, M. (2009). “Designing a decision support system to evaluate and select suppliers using fuzzy analytic network process.” Computers & Industrial Engineering, 57, 1282-1290.
9- Arabzad, S.M., Ghorbani, M., Razmi, J. and Shirouyehzad, H. (2014). “Employing fuzzy TOPSIS and SWOT for supplier selection and order allocation problem.” International Journal of Advance Manufacturing Technology, DOI 10.1007/s00170-014-6288-3.
10- Sinuany-Stern, Z., Mehrez, A. and Hadad, Y. (2000). “An AHP/DEA Methodology for Ranking Decision Making Units.” International Transactions in Operational Research, 7, 2, PP. 109-124.
11- Shirouyehzad, H. and Zandieh, S. (2011). “Performence Evaluation safety process gas refineries using DEA and AHP.” 3th Conference Data Envelopment Analysis.
12- Karimi, T. and Mohagher, A. (2006). “Priority activities maintenance using DEA and AHP.” 3th International Conference Management.
13- Hori, M.S. and Saeidinia, M.A. (2008). “Evaluate the relative efficiency and ranking teaching hospitals of University of Medical Science in diagnostic section using DEA and AHP.” Quarterly Bassirat, Vol. 40, PP.141-159.
14- Mohaghar, A., Hakkak, M. and Yaghoubi, H. (2014). “Efficiency Evaluation of Foreign Currency Branches of Bank Keshavarzi of Iran Using Integrated BSC, DEA and AHP Approaches.” International Journal of Industrial Engineering & Production Management, Vol. 25, No. 2, PP. 237-247.
15- Alam Tabriz, A., Saeidi, H. and Deilami moeizi, S. (2011). “Applying integrate approach Data Envelopment Analysis and Analytical Heirarchy Process for Efficiency Evaluation Faculties of University of Shahid Beheshti.” Journal of Management Researches, Vol. 89.
16- Mohammadi, A. and Mohammadi Hoseinzadeh, S. (2005). “Applying integrate approach DEA/AHP in ranking of insurance agents.” Journal of Economic Researches, PP. 281-304.
17- Amiri, M. and Jahani, S. (2004). “Applying integrate approach DEA/AHP for assessment and selection suppliers.” Journal of Industrial Management, Vol 5, PP. 5-18.
18- Sinuany Stern,Z., Abraham,M. and Yossi, H. (2000). “An AHP/DEA Methodology for Ranking Decision Making Units.” International Transactionsin Operational Research, Vol.7, PP.109-124.
19- Cai, Y., and Wu, W. (2001). “Synthetic Financial Evaluation by a Method of Combining DEA with AHP.” International Transactionsin Operational Research, Vol. 8, PP.603-609.
20- Wu, W. W. and Lee, Y. T. (2007). “Developing global manager’s competencies using the fuzzy DEMATEL method.” Expert Systems with Applications, 32, PP.499– 507. | ||
آمار تعداد مشاهده مقاله: 2,969 تعداد دریافت فایل اصل مقاله: 2,301 |