Saberinasab, Javad, Sahraeian, Rashed, Rohaninejad, Mohammad. (1397). Achieving an Optimal Lower Bound for Two Stage Supply Chain Scheduling with Regard to the Different Setup Time. , 52(3), 421-431. doi: 10.22059/jieng.2019.208981.1149
Javad Saberinasab; Rashed Sahraeian; Mohammad Rohaninejad. "Achieving an Optimal Lower Bound for Two Stage Supply Chain Scheduling with Regard to the Different Setup Time". , 52, 3, 1397, 421-431. doi: 10.22059/jieng.2019.208981.1149
Saberinasab, Javad, Sahraeian, Rashed, Rohaninejad, Mohammad. (1397). 'Achieving an Optimal Lower Bound for Two Stage Supply Chain Scheduling with Regard to the Different Setup Time', , 52(3), pp. 421-431. doi: 10.22059/jieng.2019.208981.1149
Saberinasab, Javad, Sahraeian, Rashed, Rohaninejad, Mohammad. Achieving an Optimal Lower Bound for Two Stage Supply Chain Scheduling with Regard to the Different Setup Time. , 1397; 52(3): 421-431. doi: 10.22059/jieng.2019.208981.1149


سامانه مدیریت نشریات علمی. قدرت گرفته از سیناوب