تعداد نشریات | 161 |
تعداد شمارهها | 6,478 |
تعداد مقالات | 70,016 |
تعداد مشاهده مقاله | 122,935,372 |
تعداد دریافت فایل اصل مقاله | 96,149,350 |
Ultimate Pit Limit Determination Using Flashlight Algorithm | ||
International Journal of Mining and Geo-Engineering | ||
دوره 55، شماره 1، شهریور 2021، صفحه 43-48 اصل مقاله (445.45 K) | ||
نوع مقاله: Research Paper | ||
شناسه دیجیتال (DOI): 10.22059/ijmge.2020.296120.594840 | ||
نویسندگان | ||
Behshad Jodeiri* ؛ Hesam Dehghani؛ Mohammadreza Sadeghi | ||
Department of Mining Engineering, Hamedan University of Technology (HUT), Hamedan, Iran | ||
چکیده | ||
In this paper, the flashlight (FL) algorithm, which is categorized as a heuristic method, has been suggested to determine the ultimate pit limit (UPL). In order to apply the suggested algorithm and other common algorithms, such as the dynamic programming, the Korobov, and the floating cone, and to validate the capability of the proposed method, the ultimate pit limit was determined in a cross-section of the Korkora reserve, which is located in Kurdistan province, northwestern of Iran and consists of 3080 blocks. The comparison of the FL algorithm and other methods revealed that same as high accuracy dynamic programming methods, the proposed algorithm could find the optimum value, while the Korobov and the floating cone algorithms failed to determine the optimum limit. | ||
کلیدواژهها | ||
Heuristic algorithm؛ Ultimate pit limit؛ Optimization؛ Flashlight algorithm | ||
مراجع | ||
[1] Lerchs, H., Grossmann., I.F. (1964). Optimum Design of Open-Pit Mines. Joint C.O.R.S. and O.R.S.A. Conference, Montreal.
[2] Pana, M.T. (1965). The simulation approach to open-pit design. 5th APCOM, Tucson Arizona, Tucson Arizona.
[3] Korobov, S. (1974). Method for determining optimal open pit limits (Montreal: Ecole Polytechnique de l’Université de Montréal. Technical report EP74.
[4] Shishvan, M. S., & Sattarvand, J. (2015). Long term production planning of open pit mines by ant colony optimization. European Journal of Operational Research, 240(3), 825-836.
[5] Elahi, E., Kakaie, R., & Yusefi, A. (2012). A new algorithm for optimum open pit design: Floating cone method III. Journal of Mining and environment, 2(2), 118-125.
[6]. Akbari, A. D., OSANLOU, M., & Shirazi, M. A. (2008). Determination of ultimate pit limits in open mines using real option approach. INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE, 19, 23-38.
[7]. Underwood, R., & Tolwinski, B. (1998). A mathematical programming viewpoint for solving the ultimate pit problem. European Journal of Operational Research, 107(1), 96- 107.
[8] Askari-Nasab, H., & Awuah-Offei, K. (2009). Open pit optimisation using discounted economic block values. Mining Technology, 118(1), 1-12.
[9] Sayadi, A. R., Fathianpour, N., & Mousavi, A. A. (2011). Open pit optimization in 3D using a new artificial neural network. Archives of Mining Sciences, 56(3), 389-403.
[10] Dimitrakopoulos, R. (2011). Stochastic optimization for strategic mine planning: a decade of developments. Journal of Mining Science, 47(2), 138-150.
[11] Xu, X. C., Gu, X. W., Qing, W. A. N. G., Liu, J. P., & Jun, W. A. N. G. (2014). Ultimate pit optimization with ecological cost for open pit metal mines. Transactions of Nonferrous Metals Society of China, 24(5), 1531-1537
[12] Chatterjee, S., Sethi, M. R., & Asad, M. W. A. (2016). Production phase and ultimate pit limit design under commodity price uncertainty. European Journal of Operational Research, 248(2), 658-667.
[13] Richmond, A. (2018). Direct net present value open pit optimization with probabilistic models. In Advances in Applied Strategic Mine Planning (pp. 217-228). Springer, Cham.
[14] Burgarelli, H. R., Souza, F. R., Nader, A. S., Torres, V. F. N., Câmara, T. R., Ortiz, C. E. A., & Galery, R. (2018). Direct block scheduling under marketing uncertainties. REM-International Engineering Journal, 71(2), 275-280.
[15] Rahimi, E., Moosavi, E., Shirinabadi, R. & Gholinejad, M. (2018). Optimized algorithm in mine production planning, mined material destination, and ultimate pit limit. Journal of Central South University. 25(6), 1475-1488. 48 M. Sadeghi et al. / Int. J. Min. & Geo-Eng. (IJMGE), 55-1 (2021) 43-48
[16] Adibi, N., Ataee-pour, M., Rahmanpour, M. (2015). Integration of sustainable development concepts in open pit mine design. Journal of Cleaner Production, 108, 1037-1049.
[17] Saleki, M., Kakaie, R., & Ataei, M. (2019). Mathematical relationship between ultimate pit limits generated by discounted and undiscounted block value maximization in open pit mining. Journal of Sustainable Mining, 18(2), 94-99. | ||
آمار تعداد مشاهده مقاله: 587 تعداد دریافت فایل اصل مقاله: 742 |