- [1] Behzad, A. and Pirayesh, M.A., 2016. Designing supply chain network of mobile factories, 2nd international conference of industrial & systems engineering. https://civilica.com/doc/540369 (In persian)
- [2] Adulyasak, Y., Cordeau, J.F. and Jans, R., 2015. The production routing problem: A review of formulations and solution algorithms. Computers & Operations Research, 55, pp.141-152.
- [3] Fu, L.L., Aloulou, M.A. and Triki, C., 2017. Integrated production scheduling and vehicle routing problem with job splitting and delivery time windows. International Journal of Production Research, 55(20), pp.5942-5957.
- [4] Lei, C., Lin, W.H. and Miao, L., 2016. A two-stage robust optimization approach for the mobile facility fleet sizing and routing problem under uncertainty. Computers & Operations Research, 67, pp.75-89.
- [5] Halper, R., Raghavan, S. and Sahin, M., 2015. Local search heuristics for the mobile facility location problem. Computers & Operations Research, 62, pp.210-223.
- [6] Raghavan, S., Sahin, M. and Salman, F.S., 2019. The capacitated mobile facility location problem. European Journal of Operational Research, 277(2), pp.507-520.
- [7] Halper, R. and Raghavan, S., 2011. The mobile facility routing problem. Transportation Science, 45(3), pp.413-434.
- [8] Mohammadi, S., Al-e-Hashem, S.M. and Rekik, Y., 2020. An integrated production scheduling and delivery route planning with multi-purpose machines: A case study from a furniture manufacturing company. International Journal of Production Economics, 219, pp.347-359.
- [9] Lei, C., Lin, W.H. and Miao, L., 2014. A multicut L-shaped based algorithm to solve a stochastic programming model for the mobile facility routing and scheduling problem. European Journal of Operational Research, 238(3), pp.699-710.
- [10] Friggstad, Z. and Salavatipour, M.R., 2011. Minimizing movement in mobile facility location problems. ACM Transactions on Algorithms (TALG), 7(3), pp.1-22.
- [11] Singgih, I.K., 2020, June. Mobile Laboratory Routing Problem for COVID-19 Testing Considering Limited Capacities of Hospitals. In 2020 3rd International Conference on Mechanical, Electronics, Computer, and Industrial Technology (MECnIT)(pp. 80-83). IEEE.
- [12] Low, C., Chang, C.M., Li, R.K. and Huang, C.L., 2014. Coordination of production scheduling and delivery problems with heterogeneous fleet. International Journal of Production Economics, 153, pp.139-148.
- [13] Liu, P. and Lu, X., 2016. Integrated production and job delivery scheduling with an availability constraint. International Journal of Production Economics, 176, pp.1-6.
- [14] Soukhal, A., Oulamara, A. and Martineau, P., 2005. Complexity of flow shop scheduling problems with transportation constraints. European Journal of Operational Research, 161(1), pp.32-41.
- [15] Hassanzadeh, A., Rasti-Barzoki, M. and Khosroshahi, H., 2016. Two new meta-heuristics for a bi-objective supply chain scheduling problem in flow-shop environment. Applied soft computing, 49, pp.335-351.
- [16] Güden, H. and Süral, H., 2019. The dynamic p-median problem with mobile facilities. Computers & Industrial Engineering.
- [17] Demir, , Eyers, D. and Huang, Y., 2021. Competing through the last mile: Strategic 3D printing in a city logistics context. Computers & Operations Research, 131, p.105248.
- [18] Tang, C.S., Veelenturf, L.P., 2019. The strategic role of logistics in the industry 4.0 era. Transportation Research Part E: Logistics and Transportation Review, 129, 1–11.
- [19] Savelsbergh, M., Van Woensel, T., 2016. 50th anniversary invited article–city logistics: Challenges and opportunities. Transportation Science 50, 579–590.
- [20] Durocher, S., Kirkpatrick, D., 2006. The steiner centre of a set of points: stability, eccentricity, and applications to mobile facility location. International Journal of Computational Geometry & Applications, 16 (04), 345–371.
- [21] Bashiri,, Rezanezhad, M., Tavakkoli-Moghaddam, R. and Hasanzadeh, H., 2018. Mathematical modeling for a p-mobile hub location problem in a dynamic environment by a genetic algorithm. Applied Mathematical Modelling, 54, pp.151-169.
- [22] Shahmoradi-Moghadam, H. and Schönberger, J., 2021. Joint Optimization of Production and Routing Master Planning in Mobile Supply Chains. Operations Research Perspectives, p.100187.
- [23] Jackson M, Wiktorsson M, Bellgran M. Factory-in-a-box — Demonstrating the next
generation manufacturing provider. Manuf. Syst. Technol. New Front., London: Springer London; 2008, p. 341–6. https://doi.org/10.1007/978-1-84800-267-8_70.
- [24] Fox S. Reliable Autonomous Production Systems: Combining Industrial Engineering Methods and Situation Awareness Modelling in Critical Realist Design of
Autonomous Production Systems. Systems 2018;6:26. https://doi.org/10.3390/systems6030026.
- [25] Koren Y, Gu X, Guo W. Reconfigurable manufacturing systems: Principles, design, and future trends. Front Mech Eng 2018;13:121–36. https://doi.org/10.1007/s11465-
018-0483-0.
- [26] Antzoulatos N, Castro E, Scrimieri D, Ratchev S. A multi-agent architecture for plug and produce on an industrial assembly platform. Prod Eng 2014;8:773–81.
https://doi.org/10.1007/s11740-014-0571-x.
- [27] Moons S, Ramaekers K, Caris A, Arda Y. Integrating production scheduling and
vehicle routing decisions at the operational decision level: A review and discussion. Computers and Industrial Engineering, 2017;104:224–45. https://doi.org/10.1016/j.cie.2016.12.010.
- [28] Behzad, A., Pirayesh, M. and Ranjbar, M., 2017. Routing and Production Scheduling for a Mobile Factory. International Journal of Industrial Engineering & Production Research, 28(3), pp.299-308.
- [29] Ivanov D, Tsipoulanidis A, Schönberger J. Erratum to: Global Supply Chain and
Operations Management, 2017, p. E1–E1. https://doi.org/10.1007/978-3-319- 24217-0_15.
- [30] Shahmoradi-Moghadam H, Samani O, Schönberger J. A Hybrid Robust-Stochastic
Optimization Approach for the Noise Pollution Routing Problem with a Heterogeneous Vehicle Fleet. International Conference Dynamics Logistics, 2020, p. 124–34. https://doi.org/10.1007/978-3-030-44783-0_12.
- [31] Braekers K, Ramaekers K, Van Nieuwenhuyse I. The vehicle routing problem: State of
the art classification and review. Computers and Industrial Engineering, 2016;99:300–13. https://doi.org/10.1016/j.cie.2015.12.007.
- [32] Fazli Besheli, B., Jahan, A. (2018). 'multi-item multi-objective optimization-location dynamic model with reliability', Advances in Industrial Engineering, 52(3), pp. 445-458. doi: 10.22059/jieng.2019.226472.1314
- [33] Demaine, E.D., Hajiaghayi, M., Mahini, H., Sayedi-Roshkhar, A.S., Oveisgharan, S. and Zadimoghaddam, M., 2009. Minimizing movement. ACM Transactions on Algorithms (TALG), 5(3), pp.1-30.
- [34] Mohammadi, S., Al-e-Hashem, S.M. and Rekik, Y., 2020. An integrated production scheduling and delivery route planning with multi-purpose machines: A case study from a furniture manufacturing company. International Journal of Production Economics, 219, pp.347-359.
- [35] Sağlam, Ü. and Banerjee, A., 2018. Integrated multiproduct batch production and truck shipment scheduling under different shipping policies. Omega, 74, pp.70-81.
- [36] Karaoğlan, İ. and Kesen, S.E., 2017. The coordinated production and transportation scheduling problem with a time-sensitive product: a branch-and-cut algorithm. International Journal of Production Research, 55(2), pp.536-557.
- [37] Benders, F. (1962). Partitioning procedures for solving mixed-variables programming
problems. Numerische Mathematik, 4(1), 238–252
- [38] De Camargo, Ricardo Saraiva, Gilberto de Miranda Jr, and Henrique Pacca L. Luna. "Benders decomposition for hub location problems with economies of scale." Transportation Science1(2009): 86-97.
- [39] Rebennack, S. “Combining sampling-based and scenario-based nested Benders
decomposition methods: application to stochastic dual dynamic programming,” Program., 156(1–2), pp. 343–389 (2016).
- [40] Magnanti, T.L. and Wong, R.T., 1981. Accelerating Benders decomposition: Algorithmic enhancement and model selection criteria. Operations Research, 29(3), pp.464-484.
- [41] Watson, F.R. and Rogers, D.F., 2006. Pareto-Optimality of the Balinski Cut for the Uncapacitated Facility Location Problem.
- [42] Geoffrion, A.M., 2010. Lagrangian relaxation for integer programming. In 50 Years of Integer Programming 1958-2008(pp. 243-281). Springer, Berlin, Heidelberg.
- [43] O’Kelly, M.E., Luna, H.P.L., De Camargo, R.S. and De Miranda, G., 2015. Hub location problems with price sensitive demands. Networks and Spatial Economics, 15(4), pp.917-945.
- [44] Contreras, I., Cordeau, J.F. and Laporte, G., 2011. Benders decomposition for large-scale uncapacitated hub location. Operations Research, 59(6), pp.1477-1490.
- [45] Easwaran, G. and Üster, H., 2010. A closed-loop supply chain network design problem with integrated forward and reverse channel decisions. IIE Transactions, 42(11), pp.779-792.
- [46] Eberhart, R. and Kennedy, J., 1995, November. Particle swarm optimization. In Proceedings of the IEEE International Conference on Neural Networks(Vol. 4, pp. 1942-1948). Citeseer.
- [47] A. C. Coello, G. T. Pulido and M. S. Lechuga, "Handling multiple objectives with particle swarm optimization," IEEE Transactions on Evolutionary Computation, vol. 8, no. 3, pp. 256-279, June 2004, doi: 10.1109/TEVC.2004.826067.
- [48] Gong, Y.J., Zhang, J., Liu, O., Huang, R.Z., Chung, H.S.H. and Shi, Y.H., 2011. Optimizing the vehicle routing problem with time windows: A discrete particle swarm optimization approach. IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews), 42(2), pp.254-267.
|