1.

An Efficient Imperialist Competitive Algorithm for Resource Constrained Project Scheduling Problem

دوره 51، شماره 2، مهر 2017، صفحه 161-174
Iman Panahi؛ Nasim Nahavandi

2.

An imperialist competitive algorithm for solving the production scheduling problem in open pit mine

دوره 50، شماره 1، شهریور 2016، صفحه 131-143
Mojtaba Mokhtarian Asl؛ Javad Sattarvand

3.

A nonlinear model to estimate vibration frequencies in surface mines

دوره 54، شماره 2، اسفند 2020، صفحه 167-171
Mojtaba Mokhtarian Asl؛ Aref Alipour

4.

Attribute Reduction in Incomplete Information System based on Rough Set Theory Using Fuzzy Imperialist Competitive Algorithm

دوره 9، شماره 1، 2017، صفحه 123-142
Mohammad Ghanei Ostad؛ Hosein khosravi Mahmoee؛ Majid Abdolrazzagh Nezhad

5.

New mathematical modeling for a facilities location and vehicle routing problem solving by a hybrid imperialist competitive algorithm

دوره 49، شماره 1، تیر 2015، صفحه 129-137
Narges Norouzi؛ Reza Tavakkoli-Moghaddam؛ Mohsen Sadegh-Amalnick؛ Sadegh Khaefi

6.

Portfolio Selection Optimization Problem Under Systemic Risks

دوره 54، شماره 2، تیر 2020، صفحه 121-140
Mohammad Ali Dehghan Dehnavi؛ Mohammad Mahdi Bahrololoum؛ Moslem Peymany Foroushany؛ Sayyed Ali Raeiszadeh

7.

Simoltaneous Lot-sizing and Scheduling in Hybrid Flow Shop Production Environment with Resource Constraint

دوره 50، شماره 2، دی 2016، صفحه 295-310
Sahar Fallah Sanami؛ Reza Ramezanian؛ Mohsen Shafiei Nikabadi

8.

Using a New Strategy in Imperialist Competitive Algorithm to Solve Multi‑objective Problems (WSICA)

دوره 55، شماره 1، شهریور 2023، صفحه 141-183
Mina Moosapour؛ Ahmad Bagheri؛ Mohammad Javad Mahmoodabadi

9.

رویکرد جیره؜بندی مخزن در بهره؜برداری بهینه از سیستم؜های منابع آب مخزن سد دویرج با استفاده از الگوریتم MOICA

دوره 52، شماره 5، مرداد 1400، صفحه 1251-1261
احسان یارمحمدی؛ محمد علی ایزدبخش؛ احمد رجبی؛ فریبرز یوسفوند؛ سعید شعبانلو


سامانه مدیریت نشریات علمی. قدرت گرفته از سیناوب