![سامانه نشر مجلات علمی دانشگاه تهران](./data/logo.png)
تعداد نشریات | 162 |
تعداد شمارهها | 6,578 |
تعداد مقالات | 71,072 |
تعداد مشاهده مقاله | 125,683,356 |
تعداد دریافت فایل اصل مقاله | 98,912,884 |
Rubber and Methane Recovery from Deproteinized Natural Rubber Wastewater by Coagulation Pre-treatment and Anaerobic Treatment | ||
International Journal of Environmental Research | ||
مقاله 1، دوره 6، شماره 3، شهریور 2012، صفحه 577-584 اصل مقاله (244.38 K) | ||
نوع مقاله: Original Research Paper | ||
شناسه دیجیتال (DOI): 10.22059/ijer.2012.528 | ||
نویسندگان | ||
M. Hatamoto1؛ H. Nagai2؛ S. Sato1؛ M. Takahashi1؛ S. Kawakami1؛ P.K. Choeisai3؛ S. Syutsubo4؛ A. Ohashi5؛ T. Yamaguchi* 1 | ||
1Department of Environmental System Engineering, Nagaoka University of Technology, 1603-1 Kamitomioka, Nagaoka, Niigata 940-2188, Japan | ||
2Department of Civil and Environmental Engineering, Tohoku University, 6-6-06 Aoba-ku, Aramaki, Sendai, Miyagi 980-8579, Japan | ||
3Department of Environmental Engineering, Khon Kaen University, Khon Kaen 40002, Thailand | ||
4Center for Regional Environmental Research, National Institute for Environmental Studies, 16-2 Onogawa, Tsukuba, Ibaragi 305-8506, Japan | ||
5Department of Social and Environmental Engineering, Hiroshima University, 1-4-1 Kagamiyama, Higashihirosima, Hiroshima 739-8527, Japan | ||
چکیده | ||
A newly developed natural rubber deproteinization process produces deproteinized natural rubber (DPNR) wastewater as an intermediate product containing a high concentration of sodium dodecyl sulfate (SDS) and rubber. In this study, a novel process to recover the residual rubber and energy as methane from DPNR wastewater was developed. As a pretreatment, SDS and residual rubber in DPNR wastewater were coagulated and recovered by addition of CaCl2 at Ca2+/SDS and Ca2+/rubber mass ratios of 0.070 and 0.055, respectively. The remaining organic matter in the pre-treated DPNR wastewater was converted to methane by using a mesophilic up-flow anaerobic sludge bed (UASB) reactor. The UASB reactor with the diluted pre-treated DPNR wastewater showed a total chemical oxygen demand (COD) removal efficiency of 92 ± 2% at a maximum loading rate of 6.8 ± 1.8 kgCOD·m-3·d-1 at a hydraulic retention time (HRT) of 12 h. Under the condition of effluent recirculation with raw pre-treated DPNR wastewater, the UASB reactor showed a total COD removal efficiency of 84 ± 8% at the maximum loading rate of 6.4 ± 1.7 kgCOD·m-3·d-1 at HRT of 39 h. The results suggest that the newly developed resource recovery process for DPNR wastewater could be a promising treatment system. | ||
کلیدواژهها | ||
Anaerobic treatment؛ Latex wastewater؛ natural rubber؛ Rubber recovery؛ Sodium dodecyl sulfate (SDS) | ||
آمار تعداد مشاهده مقاله: 5,762 تعداد دریافت فایل اصل مقاله: 5,309 |