1.

A Model to Solve Project Scheduling and Staff Assignment Problems

دوره 48، Special Issue، آذر 2014، صفحه 45-54
E. Mehmanchi؛ Sh. Shadrokh

2.

A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project

دوره 8، شماره 4، دی 2015، صفحه 653-685
Mostafa Zareei؛ Hossein Ali Hassan-Pour

3.

An Energy-efficient Mathematical Model for the Resource-constrained Project Scheduling Problem: An Evolutionary Algorithm

دوره 12، شماره 1، فروردین 2019، صفحه 91-119
Amir Hossein Hosseinian؛ Vahid Baradaran

4.

New Method to Determine Buffer Size for High Risk Project Environment in Critical Chain Method

دوره 43، شماره 1، اسفند 2009
Fatemeh Mansourian؛ Shossein Iranmanesh؛ Mohammad Tabesh

5.

Resource-Constrained Scheduling of Construction Projects Using the Harmony Search Algorithm

دوره 45، Special Issue، اسفند 2011، صفحه 51-60
yaghob gholipour؛ Mohammad Mehdi Shahbazi

6.

Solving the MRCPSP/Max with the Objective of Minimizing Tardiness Costs and Maximizing Earliness Rewards of Activities with a Two-stage Genetic Algorithm

دوره 47، شماره 1، تیر 2013، صفحه 1-13
Jafar Bagherinejad؛ Fariborz Jolai؛ Zahra Rafiee Majd

7.

طراحی مدل چندهدفه استوار برای زمان‏بندی پروژه با محدودیت منابع و موازنه زمان ـ هزینه

دوره 15، شماره 2، 1402، صفحه 223-243
محمد خدابنده شهرکی؛ سید حسین رضوی حاجی آقا؛ مریم دانشور

8.

موازنة زمان- هزینه برای بیشینه‌سازی ارزش خالص فعلی پیمانکار با الگو‌های پرداخت هزینه و محدودیت منابع با استفاده از الگوریتم‌های تکاملی (مطالعة موردی: بخش محدودی از پروژة احداث پالایشگاه میعانات گازی بندرعباس)

دوره 7، شماره 1، فروردین 1394، صفحه 43-64
مصطفی زارعی؛ حسینعلی حسن پور